Corporate Management

Mustafa Durdu - Company FounderErsin Durdu - General ManagerHüseyin Coşkun – Mekanik Grup Müdürü
1972 – 1978 Malatya Sümerbank – Pamuklu Office (Technician)
1978 – 1979 Saudi Arabia – Shedgum Gas Plant – Foster Wheeler ( Supervisor)
1979 – 1983 Afsin Elbistan – Thermal Power Plant – Foster Wheeler (Superintendant)
1983 – 1985 Malatya 2. Military Camp TEK Kangal – Sirin Construction (Subcontractor)
1985 – 1987 Trakya Hamit Abat Gas Power Plant – BBC / ENKA / ELTES (Consultant & Installation Superintendant)
1987 – 1989 Istanbul- Ankara Natural Gas Pipeline – Installation of EHN stations (52 units) – ENKA / Kurtulus Teknik
1989 – 1992 Several projects with Kurtuluş Teknik (Yuksel Birdal)
1994 – 1995 Turkmenistan -Ashgabat Airport – JLAL / ALARKO / ELTES (Supervisor)
1996 – 1997 Kazakhstan – Chezgasgan Hospital – SAMSUNG / ALARKO/ ELTES (Supervisor)
1997 – 1999 Uzbekistan Samarkand – BAT Cigarette Factory – JLAL /ALARKO/ELTES (Supervisor)
1999 – 2000 Uzbekistan – Samarkand, Bukhara ,Urgench airports modernization project – JLAL-ALARKO (Q.A. Manager)
2000 – 2001 Istanbul – Taksim Super Plaza -SIEMENS (Installation Superintendant)
2001 –CEO of EFOR Group since foundation of the Company.
1996 – 1997 Kazakhstan – Chezgasgan Hospital – SAMSUNG / ALARKO/ ELTES (Technician & Warranty Period Supervisor – BMS & LV Systems)
1997 – 1999 Uzbekistan Samarkand – BAT Cigarette Factory – JLAL /ALARKO/ELTES (Technician)
1999 – 1999 Uzbekistan Samarkand – Samkoç Bus Factory – Aktif Elektrik (Supervisor – LV Systems)
1999 – 2001 Uzbekistan – Samarkand, Bukhara ,Urgench airports modernization project – JLAL-ALARKO (Superintendant, Warranty Period Supervisor)
2001 – General Manager of EFOR Group since foundation of the Company. Successfully accomplished all projects completed by EFOR Group.
04/2000-09-2000 Türkiye, İstanbul – Metro projesi 4.Levent istasyonu- İstanbul metro (Saha Mühendisi) 11.2001-08.2002 Türkiye,İstanbul – Ko-Jenerasyon enerji merkezi kurulumu ve servisinin sağlanması- (servis Mühendisi) 08.2002-01.2004 Azerbeycan/ Bakü – Tiflis demiryolu üzerindeki poti limanı,Yakıt depolama ve aktarma istasyonu –MTG Engineering Ltd (Saha mühendisi) 02.2004-01.2005 Kazakistan/Astana – Astana Uluslararası havalimanı renevasyon projesi –Alsim Alarko ( Saha mühendisi) 02.2005-01.2006 Türkiye/İstanbul – Group Engineering Ltd. – (Proje design mühendisi) 01.2006-12.2006 Kazakistan/ Almaata – 130 Villa sitesi projesi –MTT Engineering Ltd (Mekanik grup şefi) 01.2007-02.2008 Kazakistan/Astana – Office center projesi –Arde Klima Ltd. (Mekanik grup şefi) 08.2008-03.2009 Türkiye/İstanbul – Levent Loft Residence & Office projesi –Altaca İnşaat Ltd. (Mekanik grup şefi) 04.2009-02.2010- Kazakistan/Almaata – Villa tesisi & sosyal tesisler projesi – İdeal Mekanik Ltd. (Mekanik grup şefi) 02.2010-08.2012 – Kazakistan – IMS Almaata merkez ofis, Metro Cash&Cary , AVM ler ( total 240.000m2) IMS Mühendislik Ltd. (Mekanik işler proje yöneticisi) 09.2012-10.2013 Rusya/St Petersburg – St.Petersburg havalimanı, Park Inn hotel (100.000m2) Simac M Group Ltd. (Mekanik grup müdürü) 10.2013-09.2014 Türkiye/İstanbul – Palladium Tower iş merkezi (120.000m2) Nida İnşaaat A.Ş (Mekanik grup şefi) 09.2014-03.2015 Türkiye/İstanbul – Delta Mühendislik Merkez ofis (Teklif Mühendisi) 03.2015-11.2015 Kazakistan/Almaata – Almaly holding iş merkezi , Futbol klubü Kairat (72.000m2) Signex devolopment Ltd. (Mekanik grup Müdürü) 01.2015- Efor Group Mekanik işler grup müdürü olarak görevine devam etmektedir.